About DU

Infrastructure Development

Engineering Workshop


Engineering Workshop

The construction of the Engineering Workshop has been completed. The workshop, with a built-up area of around 6,014 m2, is a two-floor structure along with a basement, a penthouse and a courtyard area.

The ground floor consists of 13 laboratories belonging to Mechanical and Mechatronics, Chemical, and Civil Engineering Departments. These Laboratories are equipped with all necessary machines and apparatuses to facilitate their services for practical courses and research activities.

Along with these labs, this floor is having a multipurpose hall, classrooms and a cafeteria. The Technical Affairs department offices are located on the first floor.

Female Dormitory No. 4


Female Dormitory No. 4

The female dormitory no. 4 is similar to the existing three dormitories. It has the added advantage of being equipped with a multipurpose hall along with a kitchen in addition to the existing facilities for the dormitory residents.

Construction of the female dormitory no. 4 has commenced from 1st September 2015 and is expected to be completed by end of January 2017.

Back to Top

Faculty and Staff

Contact DU